Bill of Materials Management in EPDM

No Comments

The bill of materials is such an important report yet it is surprising the number of users that do not have a formal strategy in place with how the bill of materials is created, edited and approved.  I’ve seen clients who don’t even use the SolidWorks bill of materials functionality and continue to use old techniques such as manually counting and entering lines in excel.  A number of years ago, there were good excuses why this still might be necissary but it is definitely not the case any more.

To understand a little more about the bill of materials frunctionality within SolidWorks and Enterprise PDM, I wrote down a few different versions of the bom you should be aware of:

  1. SolidWorks BOM in an Assembly
  2. SolidWorks BOM on a Drawing
  3. EPDM SolidWorks BOM
  4. EPDM Computed BOM
  5. EPDM Saved BOM

When planning your bill of materials process, it would be advantageous to have a good understanding of what you can and can’t do with these BOM’s and the roles that they play.  Here are a few thoughts on the matter related to recommended process.

If there is a lot of rearrangement of the bill of materials, removed components, embedded cutlists, etc. then I would recommend the SolidWorks BOM in an Assembly be the best starting point.  It provides the most amount of control and manipulation with how the SolidWorks design is constructed.  This BOM can be placed directly on a drawing avoiding the need to recompute and rearrange the BOM on the drawing.   If the majority of your rearrangement of the BOM is due to what is on the drawing, you may consider starting on the drawing and avoiding the need for the assembly BOM all together.

If control over the bill of materials is required, EPDM can help there.  The starting point for the BOM in EPDM is either the “EPDM SolidWorks BOM” which is identical to the SolidWorks Assembly or Drawing BOM or the “EPDM Computed BOM” which is computed by EPDM on the fly based on file reference counts.  If there is no modification to the BOM in SolidWorks, these are likely going to be the same.  Both of these under revision control with the assembly or drawing which they come from.

To provide an increased amount of control, either one of these BOM’s can be saved to create an “EPDM Saved BOM”.  This treats the BOM as it’s own entity and provides the flexibility of changing pretty much what ever you want.

Regardless of the BOM’s you are using in EPDM, you always have the ability to compare and export which can help a tremendous amount to communicate with other departments.

To see a little of the EPDM BOM in action, I would recommend watching this video:

 