Training Courses
Learn how to use 3DEXPERIENCE, SOLIDWORKS CAD, Simulation, and Add-in Products.
- All
- Automation
- Communication
- Design
- Electrical
- GD&T
- Manufacturing
- MBSE
- PDM
- Simulation

3DEXPERIENCE Electrical Schematic Designer
Learn how to create and manage electrical CAD documents using 3DEXPERIENCE Electrical Schematic Designer.

3DEXPERIENCE Mechanical and Surface Design Fundamentals
Learn the fundamentals of Part Design, Assembly Design, Generative Surface Design and Drafting with 3DEXPERIENCE CATIA

3DEXPERIENCE Platform Administration
The 3DEXPERIENCE Platform Administration online training course teaches you the basics of administrating the 3DEXPERIENCE Platform.

3DEXPERIENCE Project Planner
The 3DEXPERIENCE Project Planner training course covers the basics of using the Project Planner role on the 3DEXPERIENCE Platform

3DEXPERIENCE SIMULIA Structural Simulation Essentials
The Structural Simulation Essentials training course is an introduction to structural simulation on the 3DEXPERIENCE platform using the Structural Scenario Creation or Mechanical Scenario Creation app.

Administering SOLIDWORKS Manage
Administering SOLIDWORKS Manage training course covers basic setup, routine maintenance, connecting to PDM, Document and Record Objects, Users and Groups, various field types, and the Web Client.

Administering SOLIDWORKS PDM Professional
The Administering SOLIDWORKS PDM Professional course teaches you how to setup, deploy and/or administer SOLIDWORKS PDM Professional software

Administering SOLIDWORKS PDM Standard
The Administering SOLIDWORKS PDM Standard course teaches you how to setup, deploy and/or administer SOLIDWORKS PDM Standard software

CATIA V5 Fundamentals
Learn how to build simple parts, assemblies, and production drawings in CATIA V5 (3DEXPERIENCE CATIA Mechanical and Shape Engineer).

CATIA V5 Mechanical and Surface Design Fundamentals
Learn the fundamentals of Part Design, Assembly Design, Generative Shape Design and Drafting with CATIA V5

CST Studio Suite EMC/EMI Simulation & Analysis
The CST Studio Suite EMC/EMI Simulation course provides an overview on how simulation can be applied towards electromagnetic compatibility (EMC) design and analysis for emissions and immunity, conducted and radiated.

CST Studio Suite Microwave and Antenna
The CST Studio Suite Microwave and Antenna course covers the high frequency solvers used to simulate different type of antennas. The course also discusses more specific topics like antenna matching network and SAR calculations in the human body.

DraftSight Essentials
Learn how to use DraftSight to optimize your designs for manufacturability to maximize quality, avoid rework and decrease time to market

DriveWorks Professional
The DriveWorks Professional training course will provide you with the tools necessary to automate model creation and document outputs from SOLIDWORKS

GD&T Advanced
This training course is a further in-depth study of GD&T to help you understand, interpret and apply GD&T. It is based on the ASME Y14.5-2018 standard

GD&T Fundamentals
This training course is designed to help you understand and interpret the fundamentals of GDT. It is based on the ASME Y14.5-2018 standard

Geomagic for SOLIDWORKS
Learn how to use Geomagic for SOLIDWORKS software, including the best solutions for importing 3D scanned data into SOLIDWORKS to produce high fidelity models.

Intro to MBSE and SysML v2 with Cameo
Our Intro to SysML v2 course offers practical, hands-on training using Cameo Systems Modeler / CATIA Magic tools.

Intro to MBSE and SysML with Cameo
This course is for systems engineering looking to learn the SysML language and system modeling via CATIA Magic tools, also known as Cameo.

Introduction to CST Studio Suite
During this course you will become familiar with the basic usage of CST Studio Suite in terms of its modeling and simulation capabilities.

Introduction to SIMULIA Abaqus
In this practical SIMULIA Abaqus training course you will learn how to solve linear and nonlinear problems, submit and monitor analysis jobs and view simulation results

Introduction to SOLIDWORKS Simulation
The introduction to SOLIDWORKS Simulation Course is designed for SOLIDWORKS users who want to create better designs.

Managing SOLIDWORKS Data in the 3DEXPERIENCE Platform
Managing SOLIDWORKS Data in the 3DEXPERIENCE Platform course will teach you Revisioning, Tasks, Engineering Changes, and File Lifecycle in 3DEXPERIENCE

MBSE Model Simulation
Advance your Model-Based Systems Engineering (MBSE) capabilities with this in-depth course focused on SysML MBSE Model Simulation using Cameo Simulation Toolkit / Magic Model Analyst.

SIMULIA Abaqus/Explicit Advanced Topics
This course emphasizes practical skills and techniques that are needed for analyses with SIMULIA Abaqus/Explicit. Recommended for relatively new users and Abaqus/Standard users who want to learn Abaqus/Explicit.

SolidCAM 2.5D CNC Milling
Introduction to the basic concepts of SolidCAM 2.5D CNC Milling and working with SolidCAM for efficient manufacture.

SolidCAM 3D High Speed Milling
Learn the fundamental skills required to perform SolidCAM 3D High Speed Milling.

SolidCAM 4-Axis Machining
SolidCAM 4-Axis machining makes the most of 3-axis machines with simultaneous rotary capabilities.

SolidCAM 5-Axis Machining
Develop your skills for complete control over all aspects of tool path and collision checking with our SolidCAM 5-Axis Machining training course.

SolidCAM Advanced Mill-Turn
Discover more complex techniques involved with turning and further your knowledge of SolidCAM Advanced Mill-Turn.

SolidCAM AFRM
Introduction to 2.5D Automatic Feature Recognition & Machining (AFRM) programming for parts that require pocket, drill, and edge deburring recognition.

SolidCAM High Speed Surfacing
This course builds on the SolidCAM module HSR/HSM basics to add further control of your programming.

SolidCAM iMachining
Learn the basics of the SolidCAM iMachining module and program manufacturing processes.

SolidCAM Turning
Get an introduction to basic concepts of SolidCAM Turning and using the interface for efficient manufacturing.

SOLIDWORKS Advanced Part Modeling
The SOLIDWORKS Advanced Part Modeling course is for users who need to create complex parts and want to learn how to use more advanced features

SOLIDWORKS Assembly Modeling
SOLIDWORKS Assembly Modeling course will teach you how to create and edit assembly mates, layouts, and best practices for managing large assemblies

SOLIDWORKS CAD Administration
Learn the basics of SOLIDWORKS CAD administration in a PDM environment, as well as solutions to installation deployment for large groups of users.
Javelin Training Case Studies
Baylis Medical uses Javelin’s flexible SOLIDWORKS Training Day Program
Precision toolmaker in Victoria, BC completes SOLIDWORKS training and certification at astronomical pace
Manufacturing solutions experts at Systematix partner with Javelin to maximize software tools
Features & Benefits of Online Training
Learn why Javelin Live Online Learning is better than video based training
Training that reduces work day disruption
It's convenient and allows for little disruption to your working day. Live Online Training Courses are 3 or 4 hours per day.
Live online instruction from certified trainers
Certified SOLIDWORKS Instructors pass on their experience and provide best practices and tips.
More effective than video based training
With recorded videos customers are often not as focused on the training and skip exercises; plus with live online training the instructor is available to provide help or answer your questions.
Live access to the Instructor
Get help by virtually raising your hand via the online training system, and privately chat with the instructor.
It’s Hands-on Practical Training
You get plenty of time to try out the exercises and learn by using your SOLIDWORKS software
Certificate when training is completed
Just like our regular classroom based training courses you will receive a certificate when you have completed a course. Allowing you to show that you know how to use SOLIDWORKS!
Do you need a Custom Training course?
Call us free at 1-877-219-6757 and get your questions answered



